The tip of a 170 m red-and-white guyed lattice meteorological mast with a red aviation beacon, rising above a sea of blue-hour cloud with a distant wind-turbine array on the horizon
Mast tip and aviation beacon above the cloud

01 · 170 m · tip

Engineering the world's wind data.

We are the independent party in the room — and the only number everyone agrees on. We hold no position in the outcome, so OEMs, owners, lenders and independent engineers all work from the same VOTC dataset.

Standard
IEC 61400 · MEASNET
Reach
16 countries · 200+ campaigns
Siemens Gamesa ReNew Adani DNV Vestas Greenko Engie Azure Power Suzlon Tata Power CleanMax AMPYR Deutsche WindGuard JSW Energy GE Enel Vena Energy EDF Inox Wind BrightNight UL Solutions Hero Future Energies Acciona Energía Envision BluPine Energy Torrent Power Juniper Green Energy Alfanar Senvion Blueleaf Energy Vibrant Energy Zelestra NISE Hinduja Renewables Sprng Energy AMPIN Energy UPC Renewables Levanta Renewables Solarpack Fourth Partner Energy WEG
Begin the descent

Cup anemometers · Thies

Upper lattice structure and guy wires of the mast

02 · 130 m · structure

We don't just measure. We build the whole chain.

Guyed lattice masts to 170 m — designed by our in-house structural team, manufactured near Pune, installed and commissioned by our own certified crews. One accountable party from the first calculation to the commissioned, signal-live mast.

In-house design · Own manufacturing · SS316 · DIN 3060 guy rope

Guyed lattice · galvanised

Mid-structure of the mast: galvanised lattice and pre-tensioned guy wires in fog

03 · 087 m · mid-structure

Bankable wind & solar resource.

Met masts and LiDAR, ground to hub height. Thies First Class sensors, Ammonit logging — every serial tied to its calibration certificate, so the dataset survives an independent engineer's review.

Sensor serialCalibration certMEASNETNABL · ILAC

Masts to 170 m · Ground & nacelle LiDAR

Guy wires · pre-tensioned

The lower guy collar on the mast, three tensioned wires fanning down to their ground anchors

04 · 045 m · guy collar

Proof a turbine makes its power.

Independent power-performance testing to IEC 61400-12-1 — and nacelle-LiDAR fleet optimisation for yaw correction and wake steering. The AEP gain is verified by re-measurement, not modelled.

IEC 61400-12-1 · Nacelle LiDAR PPT · Yaw & wake steering

See the re-measured gain

Guy collar · DIN 3060

The warm-lit base of the mast at ground level in the fog

05 · 000 m · base

Where is the site — and what must the data prove?

Tell us where the site is and what decision the data has to support. We'll come back with a measurement scope, a programme and a price. Parties whose interests don't align, working from the same dataset.

Ground station · logger · telemetry